|
|
|
|
|
As a kind of rail level-truss secure climbing scaffold, applicable for construction and decoration of high-rise building, it is safe, advanced in technique and economic and practical.The technique consists of a bunch of national invention patents such as wedge-caulking self-lock manifold scaffold, prevention of careening of double rail, safety device to prevent the falling, hanging hoist and electronically controlled operating system.Its major technical performance:
The height of climbing scaffold:The height of four standard floors vertical missing of rail:≤+/-20mm
Height of covered way:1.8-2.0m Embedded horizontal missing:≤+/-20mm
Upward or downward step number:5-l3 steps Lifting force of the hoist:5-10t |
|
 |
|
|
| Price |
0.00 |
|
| Location |
|
|
| Minimum Order |
0 |
|
| Quantity |
500 |
|
| Shipping Cost |
0.00 |
|
| Samples Available |
no |
|
| Product Status |
New |
|
| Posted On |
Dec 18th,2006 12:00 AM |
|
| Posted By |
formwork [
Free Member ] |
|
| Payments Mode |
|
|
| Categories |
Home > Construction & Real Estate > Building Facilities |
|
|
|
|
|